Parcela 25


Leak Detection Report
30 Jan 2026 – 4 Mar 2026 (approx. 33 days)
Loss as % of water entering each location
Of 5,555 m³ entering the network
Absolute volumes (m³) at each stage of the network
| Location | In | Out | Loss | % | Status |
|---|---|---|---|---|---|
| Calle Lanzarote | 5,555 | 2,506 | 3,049 | 54.9% | FIXED |
| Calle Fuji | 485 | 308 | 177 | 36.5% | CRITICAL |
| Calle Etna | 1,030 | 904 | 126 | 12.2% | MODERATE |
| Calle Vesubio | 710 | 638 | 72 | 10.1% | MODERATE |
| Calle Kilimanjaro | 148 | 141 | 7 | 4.7% | LOW |
| TOTAL | 5,555 | 2,124 | 3,431 | 61.8% |

General Master Meter
5,555 m³
Trunk main serving all branch streets. 3,049 m³ unaccounted (54.9% of total supply). Leak Detection Survey completed and repair confirmed fixed week of 2 Mar 2026. Recheck diferencial on next month's reading to confirm resolution.
177 m³ unaccounted (36.5% of street supply). Highest loss rate of all branch streets. Leak Detection Survey required as priority. No single unit is the cause — mains pipe issue.
126 m³ unaccounted (12.2%). Elevated above the 10% amber threshold. Unit B03B consumed 219 m³ alone — a likely internal leak at that property. Recheck after Lanzarote and Fuji repairs as network pressure changes may affect this reading.
72 m³ unaccounted (10.1%). Borderline amber. Monitor next month before committing to a survey. Unit A12A consumed 81 m³ vs street average of ~17 m³ — worth flagging to the property owner.
7 m³ unaccounted (4.7%). Within acceptable tolerance. No action required this period. Note: units C03–C07 show no readings — confirm meter status with administrator.

Parcela 25 · Lanzarote
3,431 m³ lost — 3,431,000 litres
Only 38 m³ in every 100 m³ reached a billed property.
| # | Location | Action | Status |
|---|---|---|---|
| 01 | Calle Lanzarote | Leak Detection Survey — COMPLETED. Repair confirmed fixed week of 2 Mar 2026. Verify resolution on March meter reading. | Fixed 2 Mar 2026 |
| 02 | Calle Fuji | Leak Detection Survey required. 177 m³ loss (36.5%). Mains pipe issue — no single unit responsible. | Pending |
| 03 | Calle Etna | Monitor. Recheck after Lanzarote and Fuji repairs. If diferencial remains above 10%, commission Leak Detection Survey. | Monitor |
| 04 | Calle Vesubio | Monitor. Borderline at 10.1%. Recheck March reading before committing to survey. | Monitor |
| 05 | Calle Kilimanjaro | No action required. Confirm meter status for units C03–C07 (no readings this period). | No action |
The following units showed consumption significantly above their street average. These may be worth flagging to the relevant property owners or the community administrator.
Zero-consumption units — verify meter status: